SkillOpen

cra-readiness (ra qm team) (Alireza Rezvani skills and agents) (cra readiness) (4466)

Use when a company that sells software, connected devices or firmware in the EU asks whether the Cyber Resilience Act (CRA, Regulation 2024/2847) applies, has to report an actively exploited vulnerability or security incident under Article 14 (24h/72h deadlines, ENISA Single Reporting Platform), must classify products as important or critical, pick a conformity route or support period, check an SB

Front matter
name: cra-readiness
description: Use when a company that sells software, connected devices or firmware in the EU asks whether the Cyber Resilience Act (CRA, Regulation 2024/2847) applies, has to report an actively exploited vulnerability or security incident under Article 14 (24h/72h deadlines, ENISA Single Reporting Platform), must classify products as important or critical, pick a conformity route or support period, check an SBOM, or get to CE marking by December 2027. Four deterministic scripts with cited articles.
argument-hint: "[product inventory CSV | event log CSV | Annex I assessment CSV | SBOM JSON]"
license: MIT
metadata:
  version: 1.0.0
  build_pattern: "Four deterministic stdlib scripts with blocking exit codes (scope + class + route classifier, Article 14 reporting clock, Annex I/II/VII completeness gate, SBOM floor check); every rule cites Regulation (EU) 2024/2847, checked against the Official Journal text, Implementing Regulation (EU) 2025/2392 and Commission guidance C(2026) 5252"
  distinct_from: "eu-ai-act-specialist (AI Act); information-security-manager-iso27001 and isms-audit-expert (management systems, not product law); mdr-745-specialist (medical devices, which the CRA excludes); cmmc-readiness (US defence); compliance-os (multi-framework orchestration without CRA)"

CRA Readiness

Portability: 4 stdlib scripts, no network, nothing submitted anywhere. Fill CSVs, run, keep the output with the technical documentation. Not legal advice and not a conformity assessment. The manufacturer signs the declaration; on routes B+C and H a notified body decides.

The CRA has two clocks. Article 14 reporting has applied since 11 September 2026 to every in-scope product on the EU market, including ones shipped years ago. Everything else applies from 11 December 2027 (Art 71(2)). Teams fail in predictable ways: nobody can say when they became "aware", class I products are planned on self-assessment while no harmonised standard is cited, a five-year support period is set for a router people keep for eight, and the SBOM lists packages but not what the product depends on.

Workflow

# 1 - Scope: which products, which class, which route, which CSIRT?
python scripts/cra_scope_classifier.py --inventory assets/inventory.example.csv
# 2 - Report: is any Article 14 report due or overdue right now?
python scripts/art14_report_clock.py --events assets/events.example.csv
# 3 - Conformity: can we sign the EU declaration of conformity?
python scripts/annex_i_gap_check.py --assessment assets/assessment.example.csv
python scripts/sbom_check.py --sbom assets/sbom.example.cdx.json

Run step 2 first whenever a vulnerability or incident is live: it is the only step with a 24-hour deadline. --list-categories, --list and --template print the Annex III/IV categories and the 39 assessment ids.

The gates block on (exit 4)

  1. A conformity route the class does not allow (class I on module A without full harmonised standards; class II or critical on A) — Art 32.
  2. A support period under five years when the product is used for five or more — Art 13(8).
  3. No Member State to route Article 14 reports to — Art 14(7).
  4. An Article 14 report past its deadline, or an event with no recorded awareness time — Art 14(2), 14(4).
  5. An Annex I requirement NOT MET, or NA on one that applies to every product (all of Part II) — Annex I.
  6. An SBOM that is not CycloneDX/SPDX JSON, names no product, or has no top-level dependencies — Annex I Part II(1).

Hard rules

  • Unassessed is not MET. The gap check refuses a file that skips any of the 39 ids.
  • The clock runs from awareness, and you prove awareness. No timestamp means the clock runs from detection.
  • Legacy is not exempt from reporting. Products placed before 11 Dec 2027 owe Article 14 even unmodified, and after their support period ends (Art 69(3); Commission guidance).
  • Late is still owed. Micro and small enterprises escape fines for a missed 24-hour early warning (Art 64(10)(a)), not the report.
  • Cite the article. Every class, route and deadline call names its paragraph; borderline categories go to the notified body or authority, with Implementing Regulation (EU) 2025/2392 open.
  • Never submit for the user. The scripts prepare; a named person submits on the SRP and signs the declaration.

Scripts

ScriptRoleExit codes
scripts/cra_scope_classifier.pyScope (Art 2), role (Arts 19-22, 24), class (Art 7-8, Annex III/IV), routes (Art 32), legacy (Art 69), support period (Art 13(8)), reporting CSIRT (Art 14(7))0 clear · 2 findings · 3 bad input · 4 blocked
scripts/art14_report_clock.py24h / 72h / 14-day / one-month deadlines, content per report, user notice0 on time · 2 open · 3 · 4 overdue
scripts/annex_i_gap_check.py39 ids across Annex I Parts I-II, Annex VII, Annex II; NA rules; evidence0 ready · 2 gaps · 3 · 4 blocked
scripts/sbom_check.pyCycloneDX/SPDX JSON, primary component, top-level dependencies, versions, purl/CPE coverage0 pass · 2 · 3 · 4 fail

All support --help, --sample and --output json.

References and assets

  • [references/reporting_article14.md](references/reporting_article14.md) — dates, triggers, the three clocks, CSIRT routing, legacy products, penalties (7 sources)
  • [references/scope_classes_and_routes.md](references/scope_classes_and_routes.md) — scope and exclusions, roles, Annex III/IV, Art 32 routes, support period (6 sources)
  • [references/essential_requirements_and_evidence.md](references/essential_requirements_and_evidence.md) — every Annex I/II/VII item with typical evidence, retention periods, standards status (8 sources)
  • [assets/article14_runbook.md](assets/article14_runbook.md) — standing set-up and per-event record for the SRP
  • [assets/inventory.example.csv](assets/inventory.example.csv), [assets/events.example.csv](assets/events.example.csv), [assets/assessment.example.csv](assets/assessment.example.csv), [assets/sbom.example.cdx.json](assets/sbom.example.cdx.json) — input formats

Source: https://github.com/alirezarezvani/claude-skills/blob/main/ra-qm-team/cra-readiness/skills/cra-readiness/SKILL.md

Author: alirezarezvani, Alireza Rezvani skills and agents. License: MIT.

Shown here with formatting for the web. Keep the author and license notice when you reuse it.

Related entries

There are more like this in the members library

The Claude Code library holds 13,843 entries. Members can search all of them by meaning and read every one in full.